珠海市区至珠海机场城际轨道交通项目

2015-10-22 08:56:45
详细介绍

珠海市区至珠海机场城际轨道交通项目:

新建珠海市区至珠海机场城际轨道交通拱北至横琴段工程为珠海站()至长隆公园站(),线路长16.86km,建设总投资约为69.86亿元,主要工程量有:特大桥12063双线延长米、大桥301单线延长米;隧道112585双线延长米,桥隧比例87.6%(不含地下站部分);设珠海高架站1座,湾仔北、湾仔、十字门、金融岛、横琴、长隆公园地下站6座;长隆公园站设综合工区1处。建设工期42个月。公司凭借在水泥混凝土产品市场运作的丰富经验,在充分利用华润水泥、海螺水泥、珠江水泥厂等各大厂家的专家资源和先进技术基础上,成功中标该项目40万吨水泥,目前已供超过10万吨。


Zhuhai to Zhuhai Airport intercity railtransit projects:


Zhuhai to Zhuhai Airportintercity rail projects, Gongbei to Hengqin section, Zhuhai to Changlong ParkStation, the line length 16.86km, total investment of about RMB 6.986 billion,the amount of major projects included : one of large bridge with double track extendedof 2063 meters, one of bridge with single track extended of 301 meters.a tunnelwith two track extension 12585 meters, the percentage of bridge and tunnel is87.6% (excluding the underground station section); Setting a elevated railwaystation in Zhuhai, and 6 underground railway station in Wan Zai North, Wan zai, Shizimen, FinancialIsland, Hengqin, Changlong Park. There is a comprehensive work area in ChanglongPark station. The period of construction is 42 months.

With experience in the operation of thecement concrete products market, the corporate make full use of the advantage ofprofessional manufacturers which have huge expert resources and advancedtechnology, including China Resources Cement, Conch Cement, and other major cementmanufacturers in the Pearl River; Based on these, the corporate have successfulwon the project for the 400,000 tons of cement. At present, it has providedmore than 100,000 tons.


更多图片